Skip to content
INOVATIF, PROFESSIONAL DAN BERKEPRIBADIAN
facebook
youtube
instagram
Program Studi Teknik Sipil UMA – Jurusan Teknik Sipil Terbaik di Sumut
Call Support +62 813-9775-1995
Email Support [email protected]
Location Jl. Kolam No. 1 Medan Estate
Jl. PBSI No. 1 Medan Estate
  • HOME
  • PROFIL
    • AKREDITASI
    • FUNGSIONARIS
    • STRUKTUR ORGANISASI
    • VISI & MISI
  • AKADEMIK
    • INFORMASI AKADEMIK
      • AKADEMIK ONLINE
      • E-LEARNING
      • JURNAL
    • JADWAL AKADEMIK
      • Jadwal Pengisian KRS
      • JADWAL KULIAH
      • Jadwal Seminar & Sidang
      • JADWAL PRAKTIKUM
      • JADWAL UJIAN
        • JADWAL UTS
        • JADWAL UAS
      • JADWAL SEMESTER ANTARA
      • JADWAL WISUDA
    • KALENDER AKADEMIK
    • KURIKULUM
    • Road Map
    • Profil Lulusan
  • AKTIVITAS PRODI
    • KEGIATAN PRODI
    • PRESTASI PRODI
  • MAHASISWA
    • BEASISWA
      • SYARAT DAN KETENTUAN PENERIMA KIP KULIAH
      • BEASISWA BANK INDONESIA (BI)
      • BEASISWA YPHAS BAGI SISWA/I BERSAUDARA KANDUNG
      • BEASISWA YPHAS BAGI SISWA/I BERPRESTASI DI SEKOLAH (RANGKING I, II, III)
      • BEASISWA PENINGKATAN PRESTASI AKADEMIK
    • SISTEM INFORMASI
      • DATA MAHASISWA
      • JURNAL MAHASISWA
      • AOC
      • ELEARNING
      • APIK
      • OPAC
      • UMAIL
    • PRESTASI MAHASISWA
  • DOSEN
    • PENASEHAT AKADEMIK
    • DATA DOSEN
    • PRESTASI DOSEN
    • AKTIVITAS DOSEN
    • JURNAL DOSEN
    • AOC
    • TKTD
    • ELEARNING
    • OPAC
    • UMAIL
  • ARSIP
    • Dokumen Prodi
    • PENGUMUMAN
    • SK DOSEN
    • RPS MATA KULIAH
  • ALUMNI
    • TRACER STUDY
    • DATA ALUMNI
  • LABORATORIUM
    • INFO LABORATORIUM
    • APLIKASI LABORATORIUM
  • HUBUNGI KAMI

Historical Ford meeting plant transformed for studies biomedical

Posted on 1 September 20235 September 2023 by admin
0

Like many American cities inside the years before global conflict I, Pittsburgh had advanced its personal fledgling automobile enterprise. The town boasted the primary 24-hour force-in gas station in the country, a improvement that helped kick-start the town’s vehicle Row, as the stretch of metropolis across the town’s Baum boulevard and Centre road came to be recognised.Historical Ford meeting plant transformed

Detroit, led by using the Ford Motor Co., speedy mounted itself because the middle of car manufacturing. but Ford turned into additionally quickly constructing out its plant capacity across the united states. In Pittsburgh, the company opened an modern assembly plant that served for years as a car factory and a point-of-sale showroom.

Now, 70 years after Ford in the end bought the plant, it has been introduced lower back to life. the brand new iteration of the Ford Motor Co. assembly Plant is a biomedical research facility for instructional research and industry partners that is called The assembly, a joint challenge between the developer, Baltimore-based totally Wexford technological know-how+technology, and the college of Pittsburgh.

Dual-motive powerhouse

The plant became at the beginning designed by way of architect John H. Graham, Ford’s corporate architect among 1913 and 1918 and a specialist within the use of reinforced concrete, according to the nomination for the constructing’s inclusion on the national sign up of historical places, organized through JulieAnn Murphy and Jennifer Hembree, of MacRostie historical Advisors LLC. The constructing was listed at the sign up on Nov. 20, 2018.

built in 1915, the 8-story, 180,000 sq.toes shape, together with a linked six-tale extent top crane shed, value half of a million greenbacks to build. about three hundred people worked the line, the sign up report cited, “assembling a car every one-and-a-half minutes.”Historical Ford meeting plant transformed

The Pittsburgh plant used an innovative concrete construction technique, first developed in Ford’s assembly plant in Chicago. Concrete slabs in this type of construction were generally 11 in. thick and designed for live loads of 150 lb/sq ft, according to Murphy and Hembree’s report. Slabs were carried on reinforced concrete octagonal mushroom-capped columns topped with a 7 ft sq, 9 in. thick concrete plate.

In addition, these slabs utilized parallel bars that extended transversally and longitudinally. “Parallel bars ran across the entire system of bays, with some bars bent up at their supports — either the columns or the band of reinforcing connecting the column — to account for negative-movement tension at the top of the slab,” according to the report.Historical Ford meeting plant transformed

Different stages of the assembly process took place on different floors of the building, the report notes. Body assembly, frame painting, and storage were handled in the basement. Carpentry and office space occupied part of the first floor, which also hosted the building’s car showroom, while repair areas were on the second floor. The assembly line was on the third floor, and enameling, painting, and upholstery took place on the top two floors.

 

The crane shed at the Ford Motor Co. Assembly Plant in 1942. (Courtesy of The Henry Ford)
The crane shed at the Ford Motor Co. Assembly Plant in 1942. (Courtesy of The Henry Ford)

The assembly plant was along rail tracks. One problem the automaker had, according to the report, was “unloading automobile parts, distributing them within the plant, and then loading finished materials from the plant into railcars.” To solve this issue, the main assembly building was joined to the crane shed, where a roof-mounted crane could lift car parts from the Pennsylvania Railroad line that ran past the building and raise or lower them to any floor on the assembly side.

On the first floor, a garage door and sloped concrete ramp allowed cars to be moved in and out of the showroom, which itself was notable for its “historic wood frame vestibule with a denticulated cornice … (including) glazing on each side and paired full glaze doors.”

 

The original showroom after renovation work. (Courtesy Triggs Photography)
The original showroom after renovation work. (Courtesy Triggs Photography)

Ford built 31 regional assembly plants throughout the nation during the 1910s, and by the 1920s, Murphy and Hembree wrote, “more than 2,700 authorized Ford and Lincoln dealers made the Pittsburgh branch their base of operation, as did service stations in 37 counties in four states.” The Pittsburgh building served as an assembly plant from 1915 to 1932 — but ultimately assembly changes at Ford and the Great Depression reduced the need for the building. After that, it was used as a sales and parts facility until the automaker sold the building in 1952.Historical Ford meeting plant transformed

Reinvention

In the decades that followed, according to the report, the assembly building saw use as a motor supply store, a party supply store, a clothing manufacturer, and a printing business.

In 2006 the University of Pittsburgh Medical Center acquired the site. As early as 2012, architecture firm ZGF was invited to look at the project, which was eventually mothballed because of lack of funding. Wexford came on board and revived the project several years later.

For ZGF, the renovation was an opportunity to continue the assembly building’s “legacy of innovative technology,” says Deanna Keil, Associate AIA, a project manager for the project and a principal in ZGF’s Washington, D.C., office. “Because it had been used for mass automotive assembly from start to finish — assembly to sale — the existing building had an expansive floor plate.” This meant the building structure was robust and could withstand the “vibration and everything that an intensive lab building tends to mitigate and require intensive structural reinforcement for,” she explains.

Keil says the biggest challenge of dealing with such an old building was the lack of mechanical infrastructure needed to support modern, intensive lab research. Architects had to design new ductwork, pipes, and electrical systems, Keil says, as well as “identifying space for emergency generators (and) determining where to put air handling units within the building or outside the building.” A lot of the main ductwork now extends through a former elevator shaft.

 

Lab space after renovation work. (Courtesy Triggs Photography)
Lab space after renovation work. (Courtesy Triggs Photography)

Otherwise the building’s bones were, Keil says, “really kind of a creative canvas for us.” The team was “able to keep a lot of the existing architecture exposed and have that be a feature in the building rather than an obstacle to work around,” she says.

 

Structural engineering firm Thornton Tomasetti also did preliminary work on the assembly building in 2012 and returned in 2018 when the current iteration of the project officially got underway. One of the challenges, says Lisa Chong, P.E., LEED AP BD+C, the structural project manager for the project and a vice president in Thornton Tomasetti’s Washington, D.C., office, was figuring out what lateral system created the big empty space. There were no surviving structural drawings of the historic building.Historical Ford meeting plant transformed

 

Exterior of the front of the renovated building and the new building (Courtesy Triggs Photography)
The front of the renovated Ford Motor Co. Assembly Plant building and the new building that together form The Assembly complex. (Courtesy Triggs Photography)

To better determine whether its existing structural system had enough load-carrying capacity for the building’s new uses, Thornton Tomasetti and the building’s contractor turned to ground-penetrating radar scanning, a nondestructive technique that could see into the concrete to identify the presence of steel reinforcing and the location of conduits.

But these GPR scans, which were performed by Turner Construction, the building’s contractor, had their limitations. “You can figure out the spacing of the bars and how far down they are in the slab,” says Chong. “You can sort of tell the difference between the top and the bottom bars, but you can’t really get a good sense of the size of (the bars) without opening up pockets of the floor.”

Thornton Tomasetti came up with a plan to cut into the concrete columns and floor slabs to get a better look at the underlying structural system. (This was initially performed by Turner’s specialty subcontractor, ACA Engineering.) The investigation discovered that the reinforcing bars uncovered were a twisted square shape — a precursor to today’s rounded bars. It also discovered that the columns in the assembly plant and shed were actually made of steel — which significantly reduces stiffness. (The concrete was just used as fireproofing.)

Chong and her colleagues had to determine how these steel columns were connected to the concrete floor slab. “It took us a long time to determine if there were studs to transfer the load, which is how we build composite construction now,” she says. “There were not; there were reinforcing bars passed by the steel column, but they weren’t welded to it. We were able to get to a comfort level on the friction transfer between the two and determined that no retrofits were required at the column-slab connections.”

In general, the building was relatively robust. New holes were cut into the slabs, primarily for elevators and stairs (as well as new mechanical shafts for infrastructure). New steel brace frames were installed around the elevator and stair openings, and new foundations were built beneath those brace frames. Historical Ford meeting plant transformed

“Where we had issues was in the wind and seismic resistance of the building because that’s not something that was considered in the building codes in the early 1900s,” Chong says. Thornton Tomasetti designed “pretty significant” seismic retrofits on the building, which included the addition of the new steel-braced frames and their connections back to the existing floor slab as well as associated micropile foundations.

Engineers also replaced corroded steel members in the shed and added reinforced concrete. “Typically we see this level of corrosion in exposed exterior construction when concrete begins to crack and is exposed to moisture,” Chong says.

 

Exterior of new complex. (Courtesy of Triggs Photography)
Exterior of the back of the new complex, showing the renovated crane shed. (Courtesy of Triggs Photography)

In addition to restoring the Ford building, Wexford is developing an adjacent four-story building with below-grade parking, a public entry lobby, and a loading dock. The addition, designed by ZGF to be proportionally similar to the Ford building, plays off the original building’s red brick, orange-colored terra cotta, and window proportions. The new building also features prominent diagonal bracing supporting a cantilevered section (the V-shaped supports echo the diagonal bracing of the crane shed’s curtain wall).

The courtyard-style space under the cantilevered section is meant to serve as an external public gathering and respite space off busy Centre Avenue (there’s also space for a future restaurant).

 

The lobby of the new building. (Courtesy Triggs Photography)
The lobby of the new building. (Courtesy Triggs Photography)

The renovated Ford building will house University of Pittsburgh researchers focused on cancer biology and immunology. Some moved into the building in late spring, while yet-to-be-identified industry partners are expected to eventually lease space in the new building.

 

The renovated crane shed. (Courtesy of Triggs Photography)
The renovated crane shed. (Courtesy of Triggs Photography)

Perhaps the signature element of the new complex will be the renovated crane shed, which has been transformed into a giant gathering space. “It’s really a public amenity for not only the users, the tenants in the space, but also for the city of Pittsburgh,” says Keil. The new space can accommodate both scientific and collaborative events for building tenants as well as weddings and other public events. “We’re really hopeful that it can be a melting pot for both collaboration and just engagement in the community.”

Read Also :
Definition and Definition of Work Volume

View this post on Instagram

Shared post on Time

BERITA
Dari Teori ke Lapangan: Belajar Langsung di Jantung Industri! 🧡👷‍♂️👷‍♀️
Melihat langsung skala...
Menuju Jepang: Mahasiswa Teknik Sipil UMA Ikuti Tahapan Seleksi Magang Internasional
Mahasiswa Program Studi...
Universitas Medan Area Sembelih 24 Ekor Lembu dan 2 Ekor Kambing pada Idul Adha 1447 H
Perayaan Hari Raya...

Kaitan UMA

Lokasi Fakultas Teknik UMA

KAMPUS I :

Jalan Kolam No. 1 Medan Estate / Jalan Gedung PBSI, Medan 20223
Telepon : (061) 7360168, 7366878, 7364348
Fax : (061) 7368012
Call Center : 0811-6013-888

KAMPUS II :

Jalan Sei Serayu No. 70 A / Jalan Setia Budi No. 79 B, Medan 20112
Telepon : (061) 8225602, 8201994
FAX : (061) 8226331
Call Center : 0811-6013-888

Silahkan kunjungi juga website Prodi :  
  • Teknik Elektro : elektro.uma.ac.id
  • Teknik Mesin : mesin.uma.ac.id
  • Teknik Arsitektur : arsitektur.uma.ac.id
  • Teknik Industri : industri.uma.ac.id
  • Teknik Informatika : informatika.uma.ac.id
 
Copyright © 2016 - 2026 PDAI - Universitas Medan Area